1 For widening of Moradabad Bareilly Section of existing 2 Lane Road to 4 Lane dual carriageway and construction of minor structure of NH-24 from Km 190.00 to 236.200. Uttar Pradesh  IL&FS Transportation Networks Ltd., Mumbai 186.000 510.99
2 Four Laning of Reengus to Sikar Section of NH-11 from existing chainage 298.075 (design chainage Km. 297.850) to existing chainage Km. 341.047 (design chainage Km. 342.280). Rajasthan Reengus Sikar Expressway Limited, New Delhi   175.200 201
3 Development & Operation of Sikar - Bikaner section of NH-11 from km 340.188 of NH-11 to km 557.775 of NH-11 via Sikar Bypass and Bikaner Bypass from km 553.869 of NH-11 to km 267.325 of NH-89 by Two Laning with Paved Shoulder in the State of Rajasthan. Rajasthan IL&FS, Transportation Networks Ltd., Mumbai  501.000 437.56
4 Four Laning of Beawar Gomti Section of NH-8 (From Km. 58.245 to Km. 177.050) in the State of Rajsthan Rajasthan IL&FS Transportation Networks Ltd., Mumbai 234.620 358.99
5 Development of Jodhpur - Pali Section of NH-65 from Km. 308.000 to Km. 366.000 & including bypass to Pali starting from Km. 366.000 of NH-65 to Km. 114.000 of NH-14, in the State of Rajasthan. Rajasthan Jodhpur Pali Expressway Limited, New Delhi 288.000 386.41
6 Two Laning with Paved Shoulders of Lambia Raipur Section of NH-458 From Km. 163.800 (Existing Chainage Km. 168.290) to Km. 216.600 (Existing Chainage Km. 222.535) (Length 52.800 Km.) in the State of Rajasthan under NHDP Phase-IV on Engineering Procurement and Construction (EPC) Mode Rajasthan National Higjhways Authority of India, New Delhi 158.400 133.57
7 Widening & Strengthening to Two-Lane with Paved Shoulders of Raipur – Jassa Khera Section of NH-458 (Package-III) From Km. 216.600 (Existing Chainage Km. 222.400) to Km. 248.960 (Existing Chainage Km. 257.105) (Length 32.360 Km.) in the State of Rajasthan under NHDP Phase-IV on Engineering Procurement and Construction (EPC) Mode Project  Rajasthan National Higjhways Authority of India, New Delhi 129.440 118.47
8 Widening and Strengthening of Existing Highway Section to Two Lane with paved shoulder from Km. 00.000to Km. 33.000 of NH-148D in Rajasthan, Package - I (Bheem to Parsoli including Bheem & Parsoli Bypass) Rajasthan National Higjhways Authority of India, New Delhi  99.000 80.38
9 Widening amnd Strengthening  of Existing Highway Section to Two Lane with Paved shoulder from Km. 33.000 to Km. 69.267 of NH-148D in Rajasthan, Package-II (Parsoli to Gulabpura) Rajasthan National Higjhways Authority of India, New Delhi 108.801 87.18
10 Improvement of Corridor between Mukarba Chowk to Wazriabad Chowk - SH - C/o Parallel Road in Zone P-1 on other side of Nallah from Sanjay Gandhi Transport Nagar to Wazriabad Chowk New Delhi Executive Engineer, Flyover Project Division, New Delhi 52.800 135.85